TLT-Turbo GmbH
Success StoriesEfficient, Oil-Free, and On Time - MVR Innovation at a Sugar RefineryBack to overview

Efficient, Oil-Free, and On Time - MVR Innovation at a Sugar Refinery

Tailored MVR Technology for High-Performance Demands

A leading sugar refinery in the North Africa & Middle East region was seeking an energy-efficient, low-maintenance solution for its production line. Already operating several MVR units from other suppliers, the facility faced recurring challenges due to high annual maintenance costs and extended downtimes. The key requirement: a new MVR system that would deliver improved efficiency, require minimal maintenance, and be fully operational before the start of the beet harvest.

 

TLT-Turbo Delivers Performance and Reliability

TLT-Turbo provided a customized multistage MVR solution incl. control unit for controlling the MVR stages - an additional requirement that went beyond the standard scope of a typical MVR project. The system was specially engineered to meet  the operational requirements of the customer’s process.

Leveraging high design and engineering standards, seamless integration into the DCS (Distributed Control System – a centralized system for process automation), and smart logistics, TLT-Turbo – in close collaboration with the customer’s project team – ensured that the equipment was manufactured, delivered, installed, and commissioned in under eight months – right in time for the start of the beet harvest.

Results: Energy Efficiency Meets Operational Excellence

The newly installed MVR system was successfully integrated into the production line and demonstrated outstanding performance from day one. Key benefits include:

  • Significantly reduced energy consumption
  • No annual maintenance required
  • Minimal downtime during rare service intervals
  • Optimized for specific process conditions

For the sugar refinery, this translates to predictable costs, reduced operational interruptions, and a reliable, future-ready solution for mechanical vapor recompression at industrial scale.

A Project with Regional Impact

With this successful implementation, TLT-Turbo reinforces its role as a trusted MVR partner in the North Africa and Middle East region. The ability to execute such a time-sensitive project demonstrates how tailored technology, reliable logistics, and close customer collaboration drive results.